El Rincon SD9189
Jurisdiction:
Address of Facility:
El Rincon Road (all address numbers), Bay Point area (Region 2)
Party Responsible For Maintenance:
Construction Complete Date:
Jan 1, 2014
Designed to Hold Water > 72 Hours:
N
LID Performance:
GreenPlan-IT Tracker can automatically estimate the performance of a facility based on key attributes of the installation and its specific location in the landscape.
More Information about the Toolset
GreenPlan-IT Tracker is one componentĀ of the GreenPlan-IT toolset, a collection of geospatially enabled tools designed to facilitate science-informed planning of green infrastructure. To learn more about the other components of the toolset, visit the main GreenPlan-IT site.