Alternate Site ID(s): 
71663
Public/Private: 
Public
Jurisdiction: 
Address of Facility: 
84th Ave at G St, Oakland
Status: 
Complete
Project Watershed: 
Total Site Area (Acres): 
2.40
Total Area of Land Disturbed (Acres): 
0.00
Total New Impervious Surface Area (ft2): 
0.00
Total Replaced Impervious Surface Area (ft2): 
0.00
Total PreProject Impervious Surface Area (ft2): 
0.00
Total PostProject Impervious Surface Area (ft2): 
0.00
Construction Complete Date: 
Apr 8, 2010
HM Controls: 
Unk
Designed to Hold Water > 72 Hours: 
N
Drainage Management Area (Geospatial): 
Type of Treatment/HM Controls Inspected: 
Location Name: 
Tassafaronga Village (OHA)
Estimated?: 
No
Location: 
LID Performance: 

Performance reporting not available to the public.

 

Groups audience: