Honda Port of Entry
Public/Private:
Private
Jurisdiction:
Address of Facility:
Foot of Canal Boulevard
Status:
Complete
Party Responsible For Maintenance:
Construction Complete Date:
Jan 1, 2011
Designed to Hold Water > 72 Hours:
N
Maintenance/Inspections Logs:
Drainage Management Area (Geospatial):
LID Performance:
GreenPlan-IT Tracker can automatically estimate the performance of a facility based on key attributes of the installation and its specific location in the landscape.
More Information about the Toolset
GreenPlan-IT Tracker is one componentĀ of the GreenPlan-IT toolset, a collection of geospatially enabled tools designed to facilitate science-informed planning of green infrastructure. To learn more about the other components of the toolset, visit the main GreenPlan-IT site.