Juniper Networks
Alternate Site ID(s):
2011-7636
Public/Private:
Private
Jurisdiction:
Address of Facility:
1081, 1133, 1139 Innovation Wy
Status:
Complete
Project Watershed:
Total PreProject Impervious Surface Area (ft2):
0.00
Total PostProject Impervious Surface Area (ft2):
0.00
Construction Complete Date:
Jan 1, 2015
Designed to Hold Water > 72 Hours:
N
Maintenance/Inspections Logs:
Drainage Management Area (Geospatial):
LID Performance:
Performance reporting not available to the public.
More Information about the Toolset
GreenPlan-IT Tracker is one componentĀ of the GreenPlan-IT toolset, a collection of geospatially enabled tools designed to facilitate science-informed planning of green infrastructure. To learn more about the other components of the toolset, visit the main GreenPlan-IT site.