Aster Place
Alternate Site ID(s):
2005-0510
Jurisdiction:
Address of Facility:
1156 Aster Av
Status:
Complete
Project Watershed:
Total PreProject Impervious Surface Area (ft2):
1.88
Total PostProject Impervious Surface Area (ft2):
1.79
Construction Complete Date:
Jan 1, 2007
Drainage Management Area (Geospatial):
LID Performance:
Performance reporting not available to the public.
Groups audience:
More Information about the Toolset
GreenPlan-IT Tracker is one componentĀ of the GreenPlan-IT toolset, a collection of geospatially enabled tools designed to facilitate science-informed planning of green infrastructure. To learn more about the other components of the toolset, visit the main GreenPlan-IT site.