Warmington Residential
Alternate Site ID(s):
2014-4543
Jurisdiction:
Address of Facility:
968 E Taylor Av
Status:
Construct
Project Watershed:
Total PreProject Impervious Surface Area (ft2):
2.80
Total PostProject Impervious Surface Area (ft2):
0.00
Construction Complete Date:
Jan 1, 2017
Drainage Management Area (Geospatial):
LID Performance:
Performance reporting not available to the public.
Groups audience:
More Information about the Toolset
GreenPlan-IT Tracker is one componentĀ of the GreenPlan-IT toolset, a collection of geospatially enabled tools designed to facilitate science-informed planning of green infrastructure. To learn more about the other components of the toolset, visit the main GreenPlan-IT site.